Put FIBRAN ECO WL in the wall between two rows bricks is made better heatinsulation quality of these walls. When the double walls are isulated, pieces of FIBRAN ECO WL have to pit between walls and to fix toward inside wall by special carried alements.
Heat waste from air circulation is avoided if the flatnesses are put each other perfectly and flooring and wall isolation are put in right way.
Assembly of FIBRAN ECO WL in double wall:
The flatnesses are cling closed to inside of the build wall, after that is build. Second wall from cellular concrete or bricks. Two walls have to catch each other by metal spits through heatinsulation. In each m2 have to put at least one split and more if necessary according the plan.